The Lianyungang - Khorgos Expressway connects Lianyungang City in Jiangsu Province and Ili Kazak Autonomous Prefecture in Xinjiang Uygur Autonomous Region in China, and is the seventh of 18 east-west crossing lines in China's national expressway network.
The Zhengzhou East Third Ring Road North toll station is one of the first 15 precision toll pilot projects for the optimization and upgrading of the national highway network toll system and the first precision toll demonstration station pilot project in Henan Province, and it also bears the dual responsibility of verifying the technical route and management mode of the new toll system.
This project is a system integrating "cloud, network, edge, and end" collaborative architecture to realize the organic integration of business services and data, and can remotely centralized control "edge and end" on the platform side. The platform functions and services can be flexibly iterated, and services can be deployed on-demand according to the needs of business scenarios, so as to achieve service intensification and scale, and reduce operating costs.
According to customer demand, Linkbasic adopts Linkbasic A1 series micro data center eight link cabinet, which integrates cabinet system, power supply and distribution system, refrigeration system, dynamic ring monitoring system, the main components include distribution unit, rack UPS, rack type air cooling precision air conditioner, dynamic ring monitoring screen, water leakage sensor, smoke sensor and other components.
Linkbasic micro data center solutions build a safe, stable, high-speed, cost-effective network environment, but also for thestable operation of equipment and computer room security to provide the maximum guarantee.
Copyright Linkbasic Information Technology Co., Ltd..all rights reserved.